Tokens on tasting room bar |
That happened on Monday (July 8th); Rinn Duin's application to the state for a brewing license is still pending.
Founder Chip Town says once the ongoing brewery buildout wraps up, he hopes state regulators will be able to inspect the brewery and issue a license quickly.
"I'm expecting by end of August, beginning of September we'll be out on taps," Chip says. "We're that close now. It's a matter of finishing this (buildout) in the next couple of weeks and getting the testing done. Once that's done, a couple of weeks to make the beer, keg it and get it out the door."
Rinn Duin founder Chip Town in the Toms River brewery's tasting room |
"Everything is approximately where it should be. Now what we've got to do is tweak the exact position because the piping is all premade," Chip says. "The technicians are here. One is doing the piping, the other one is doing the electrical installation, all the control panels, all the motors. It's probably going to be 15 to 20 days to do the complete installation.
"Once we've got all the piping and the wiring done, I can call for a (certificate of occupancy), and then the ABC will come in and do their inspection."
Brewhouse, assembly required |
Rinn Duin's six-tap, 500-square-foot tasting room was finished during the springtime and is stocked with glassware (shaker pint glasses and growlers). Beer drinkers can expect plenty of brews exclusive to the tasting room.
"Those taps are going to have a lot of different beers in them that you aren't going to see in the bars right away," Chip says.
No comments:
Post a Comment